how are you doing V8?
Did you see my post about target stands.
on the faint.
Rocking Windows 8 and finishing up installing everything
Nope. New Client, I can only get INGO on my phone so I'll probably be a ghost around these parts
how long with the new client?
Nope. New Client, I can only get INGO on my phone so I'll probably be a ghost around these parts
depending on when the next training day is I will have a swinging target link Handk had. AND a spinning system that will have one or two targets that spin and stay for 1/2 to 10 seconds then rotate back.
It just takes FOREVER!!
how long with the new client?
we are in the process of upgrading our work stations and it takes about two days to install all the programs and get all the email and everything else moved. (That is two business days)
we do that on the equipment controllers. on our individual work stations they all have different software other than MS office. BUT, I do Like imaging systems it is nice.You know, if you have machines that are all the same you can install it all on one and image the rest. Speeds it up a TON
I am basically replicating this system.
Beacon Target Turner, Inc
only downside is it will require compressed air 12VDC.
we do that on the equipment controllers. on our individual work stations they all have different software other than MS office. BUT, I do Like imaging systems it is nice.
I am doing it on the cheep I have all the pneumatic stuff laying around already. if I do it all electric I would have to buy stuff. To do it all mechanical would be hard to do and keep it consistent across multiple shooters.That could easily be made with an electric motor if you wanted.
I'm sure there's a way to make it complete mechanical too