Are you in West Central Indiana?I have a 25x45 gravel driveway that I want to concrete. Prep will take minimal gravel addition on spots, tire resting spots. And I was hoping for at least 4 inches thick or 5 if my wallet can go that deep. Anyone have a guesstimate of the material minus any gravel I need and labor for a job of this size?
Existing drive has been gravel since 61.
As always this is only my opinion, but the least expensive way to do a concrete job, is to do it properly the first and only time.
If not you will be paying to do it again. Doesn’t mater if it’s flat or standing up concrete. (Road, or Wall).
You may save a few bucks if you use 6 bag mix over 9 bag hi-early, but unless you have a few friends that know mud, and will do you a solid. Call a pro and do it right, you’ll be better off for it. Best of luck.
Last edited: