Nope. It can do direct both ways.
Thanks
Nope. It can do direct both ways.
Found a smokin' deal on Daniel Defense's version of the MK18 upper. This one is from an INGOer in Muncie, and it comes with DD irons. He just dropped the price from $700 to $650 for the complete upper. Someone needs to jump on this.
https://www.indianagunowners.com/fo...96010-daniel_defense_mk18_upper_receiver.html
I'm just passing on an interesting deal, not vouching for this particular member. Always do your homework and check feedback.
Is it here yet?
No.
Made you look.
Eh, you still have a couple of months.
My original "guess" was by our anniversary, which is this coming weekend.
I'm now thinking mid-May.
Funny thing, I'm HOPING to have mine by NFA day. Oh the milestones we set.
Funny thing, I'm HOPING to have mine by NFA day. Oh the milestones we set.
When is NFA day...wondering if I'll have my SBR's blackout by then.
You can expect a full workup once the Form 1 arrives. Range time, glamor shots, videos, the works.
We already have enough of those with you. How about some of the gun!
So its now been 18-months since I started this project and 6-months since I sent off my Form 1. Still nothing.
I've been able to put it out of my mind for the most part, but now I'm getting anxious.
You can expect a full workup once the Form 1 arrives. Range time, glamor shots, videos, the works.
So its now been 18-months since I started this project and 6-months since I sent off my Form 1. Still nothing.
I've been able to put it out of my mind for the most part, but now I'm getting anxious.
You can expect a full workup once the Form 1 arrives. Range time, glamor shots, videos, the works.
Will this be at the 1st annual Noveske shoot????
Just out of curiosity, what is the wait time to get everything "approved"? I would love to build and SBR but hear that it takes an eternity to go thru?
Define eternity? I mean, you have to wait less than a year to have something for possibly 20+ years.
Does the wait suck? Yes. Is it worth it? Yes.
Just out of curiosity, what is the wait time to get everything "approved"?