Family and I are back in Alaska working on our cabin. It is on an island. We started this project in 2017 and this is our forth trip since then. We have family up here and they use it when we are not here.
This trip is focused on finishing the inside walls.
The only room left to finish will be our bedroom. Then I will install the trim and a tile back spash in the kitchen.
Everything is off grid. The fridge and stove both run on propane. We have solar or a small Ryobi generator for cabin power.