I have a 25x45 gravel driveway that I want to concrete. Prep will take minimal gravel addition on spots, tire resting spots. And I was hoping for at least 4 inches thick or 5 if my wallet can go that deep. Anyone have a guesstimate of the material minus any gravel I need and labor for a job of this size?
Existing drive has been gravel since 61.
Existing drive has been gravel since 61.